![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
Automatic Cable Routing System Functions Automatic Cable Routing Obeying NEC Rules for Segregation and Tray/Conduit Cable Fill Raceway Sizing Spreadsheet Query and Update For All ACRS Database Tables Automatic Entry and/or Exit Point Based Upon Equipment Location Optional Automatic Conduit Selection and Sizing Cable Bundle Reports For Construction On-line List of Cables and Fill for Raceways Cable Pull Cards for Installation Optional 3D Review of a Cable's Master Level Route Installation Tracking Develop Cable From/To List and Cable Types Develop Equipment List and Locations Layout Major Raceway Paths (Master Level) and Add Nodes Route Cables (using interactive or batch) On Major Raceway Paths Investigate Cables That Will Not Route and Modify Design Identify Tray Capacity Requirements and Develop Carrier Data Allocate Cables to Trays and Check Tray Fill Develop Cable Tail End Design Verify Design with ACRS Reports Import Cable Types Import Cable From/To List Import 3D Tray and Conduit Design to Plant/CMS (optional) Establish Master Level Data Develop Carrier Data Import Cable Vias Modify/Add/Route Cables as Needed
|
Microsoft Access Database |
Cable From/To List Includes equipment, cable type and service level | Cable Type List Includes description and diameter | Equipment List Includes description, location and top/bottom indication |
Master Level Data Includes nodes/geometric path, length and acceptable service levels and capacity used for each service level. | Carrier Level Data Includes service level, size and capacity used. | Cable Routing Constraints May contain all or part of a cable route or restrictions of nodes or carriers. |
Cable Routing Results and Graphic Links Cable routes are stored in a database table. Each tray and conduit is named and is correlated to the Plant/CMS model. PC-ReView can graphically display the geometry of a cable route. PC-ReView can show cable fill for selected raceways. |
CSA's Latest Experience Nuclear Plant Cable Design Verification Check Cable Segregation in Trays and Penetrations Check Cable Proximity Segregation In Penetrations Check Cable Redundancy Check Cable Via Continuity Check Tray Loading Check F Factor Between Large Power and Control 3D Documentation of Trays and Cable Vias With Output to PDMS |
![]() |
CSA, Inc. ©2001 Tel: 770.955.3518 | Fax: 770.956.8748 Home | Company | Services | Products | Customers | Projects | News/ Information | Gallery | Contact US |